Facebook Twitter Instagram
    Medford Report Medford Report
    • Local News
    • Oregon
    • Community
    • COVID-19
    • Crime
    • Education
    • Environment
    • Trending
    • About us
    Subscribe
    Medford Report Medford Report
    Home»Local News»The City’s 2023 street preservation work begins in April as councilors approved a paving contract and a slurry seal contract 
    Local News

    The City’s 2023 street preservation work begins in April as councilors approved a paving contract and a slurry seal contract 

    Share
    Facebook Twitter LinkedIn Pinterest Email

    Bend, OR – According to the city officials, the City of Bend is preparing to do about $3.2 million worth of street preservation contract work this year that will improve approximately 37 lane miles in Bend.

    This includes about 18 lane miles of asphalt grind and inlay and about 19 lane miles of slurry seal treatments.

    The map at www.bendoregon.gov/streetpreservation shows which roads will get treated this summer.

    The City’s “Keep Good Roads Good” philosophy means we maintain and preserve streets with the most cost-effective treatment for the road condition — the right treatment at the right time.

    Maintenance treatments selected for the 2023 construction season include:

    • Inlays and overlays – Old asphalt is ground out and replaced or a new layer of asphalt is paved on top of existing roadway. The process can take a couple of days.
    • Slurry – A treatment for low-volume residential streets. One-day closures typically expected.

    A road’s condition helps the City determine maintenance plans. The worst roads need full reconstruction. Reconstruction is exponentially more expensive than maintenance, which is not an efficient use of maintenance funds and more likely to be paid for as part of a larger Capital Improvement Program.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Drug trafficking investigation brings coordinated law enforcement operation to Medford area

    September 26, 2026

    Teen arrested after fatal Rogue River crash that sparked 15,000-acre wildfire

    September 26, 2026

    Medford Police accepting applications for free cadet program through Sept. 30

    September 26, 2026

    Medford seeks community input on proposed MURA 2.0 urban renewal plan

    September 26, 2026

    Comments are closed.

    Popular

    Drug trafficking investigation brings coordinated law enforcement operation to Medford area

    September 26, 2026

    Teen arrested after fatal Rogue River crash that sparked 15,000-acre wildfire

    September 26, 2026

    Medford Police accepting applications for free cadet program through Sept. 30

    September 26, 2026

    Medford seeks community input on proposed MURA 2.0 urban renewal plan

    September 26, 2026

    Medford Parks and Recreation volunteers donated 262 hours and removed more than 1,300 pounds of trash and debris in August

    September 24, 2026

    Medford crews install new pavement markings and parking layout on Main Street as work continues overnight

    September 24, 2026
    Latest news
    • Oregon State Football Depth Chart for ASU Sun Devils
    • RV park provides shelter for Asante employees displaced by fires
    • Teacher says ‘man would have killed her if she was white’ after he pulled a large butcher knife and robbed the 36-year-old woman before locking her inside a closet!
    • Grants Pass City Council Approves Two Additional Resting Sites for Unhoused Individuals
    • Grants Pass Deploys Mobile Surveillance Trailer at Homeless Camp, Sparking Concerns

    Facebook Twitter Instagram Pinterest
    • Local News
    • Oregon
    • Community
    • COVID-19
    • Crime
    • Education
    • Environment
    • Trending
    • About us
    © 2026 Medford Report. Designed by Tony Cooper.

    Type above and press Enter to search. Press Esc to cancel.