Facebook Twitter Instagram
    Medford Report Medford Report
    • Local News
    • Oregon
    • Community
    • COVID-19
    • Crime
    • Education
    • Environment
    • Trending
    • About us
    Subscribe
    Medford Report Medford Report
    Home»Local News»The Oregon Department of Transportation completed a new traffic roundabout in West Linn that connects OR 43 and northbound I-205
    Local News

    The Oregon Department of Transportation completed a new traffic roundabout in West Linn that connects OR 43 and northbound I-205

    Share
    Facebook Twitter LinkedIn Pinterest Email

    Medford, OR – According to the state officials, the roundabout is a critical safety improvement for people walking, driving and rolling, marking a key milestone for the I-205 Abernethy Bridge Project, ODOT’s largest construction project in 45 years.

    Upon completion, the Abernethy Bridge will be the first earthquake ready highway bridge over the Willamette River in the Portland area.

    Users will benefit from a wider bridge, as well as safer and more efficient on- and off-ramps near the bridge. Improvements are also planned for bike and pedestrian routes.

    The full project is expected to be completed in 2025. After construction, we plan to collect tolls at the Abernethy Bridge to cover roughly half the project’s cost. Transportation funds collected statewide will pay the remainder.

    Roundabouts are safer than intersections that rely on stop signs and traffic signals because they have fewer vehicle and pedestrian conflict points. A traditional intersection has 32 possible points of collision, many of which are dangerous and high-speed.

    That’s compared to roundabouts that have only eight possible points of collision. Roundabouts also reduce crash severity and injuries in all crashes due to lower vehicle speeds.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Drug trafficking investigation brings coordinated law enforcement operation to Medford area

    September 26, 2026

    Teen arrested after fatal Rogue River crash that sparked 15,000-acre wildfire

    September 26, 2026

    Medford Police accepting applications for free cadet program through Sept. 30

    September 26, 2026

    Medford seeks community input on proposed MURA 2.0 urban renewal plan

    September 26, 2026

    Comments are closed.

    Popular

    Drug trafficking investigation brings coordinated law enforcement operation to Medford area

    September 26, 2026

    Teen arrested after fatal Rogue River crash that sparked 15,000-acre wildfire

    September 26, 2026

    Medford Police accepting applications for free cadet program through Sept. 30

    September 26, 2026

    Medford seeks community input on proposed MURA 2.0 urban renewal plan

    September 26, 2026

    Medford Parks and Recreation volunteers donated 262 hours and removed more than 1,300 pounds of trash and debris in August

    September 24, 2026

    Medford crews install new pavement markings and parking layout on Main Street as work continues overnight

    September 24, 2026
    Latest news
    • Oregon State Football Depth Chart for ASU Sun Devils
    • RV park provides shelter for Asante employees displaced by fires
    • Teacher says ‘man would have killed her if she was white’ after he pulled a large butcher knife and robbed the 36-year-old woman before locking her inside a closet!
    • Grants Pass City Council Approves Two Additional Resting Sites for Unhoused Individuals
    • Grants Pass Deploys Mobile Surveillance Trailer at Homeless Camp, Sparking Concerns

    Facebook Twitter Instagram Pinterest
    • Local News
    • Oregon
    • Community
    • COVID-19
    • Crime
    • Education
    • Environment
    • Trending
    • About us
    © 2026 Medford Report. Designed by Tony Cooper.

    Type above and press Enter to search. Press Esc to cancel.