Facebook Twitter Instagram
    Medford Report Medford Report
    • Local News
    • Oregon
    • Community
    • COVID-19
    • Crime
    • Education
    • Environment
    • Trending
    • About us
    Subscribe
    Medford Report Medford Report
    Home»Local News»Hillcrest Road Closure in Medford for Road Reconstruction and Storm Drainage Installation
    Local News

    Hillcrest Road Closure in Medford for Road Reconstruction and Storm Drainage Installation

    Share
    Facebook Twitter LinkedIn Pinterest Email

    Medford, OR – Hillcrest Road, located between Foothill Road and Urano Lane, is closed to through traffic from January 14 through March 9, as part of a significant road reconstruction project. The closure will also facilitate the installation of a new storm drainage system, which aims to improve infrastructure in the area.

    During the closure, drivers will be directed to detour routes via North Phoenix Road and Stanford Road. Access to local businesses along Hillcrest Road will remain open and will be clearly marked with signage throughout the construction period.

    Motorists are advised to anticipate delays, particularly during peak travel hours, and plan accordingly. The project timeline is subject to change based on weather conditions, which may impact the completion schedule.

    Authorities urge drivers to follow detour signs and exercise caution in the construction zone to ensure both worker and public safety. As the project progresses, updates will be provided to keep residents and travelers informed of any changes.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Drug trafficking investigation brings coordinated law enforcement operation to Medford area

    September 26, 2026

    Teen arrested after fatal Rogue River crash that sparked 15,000-acre wildfire

    September 26, 2026

    Medford Police accepting applications for free cadet program through Sept. 30

    September 26, 2026

    Medford seeks community input on proposed MURA 2.0 urban renewal plan

    September 26, 2026

    Comments are closed.

    Popular

    Drug trafficking investigation brings coordinated law enforcement operation to Medford area

    September 26, 2026

    Teen arrested after fatal Rogue River crash that sparked 15,000-acre wildfire

    September 26, 2026

    Medford Police accepting applications for free cadet program through Sept. 30

    September 26, 2026

    Medford seeks community input on proposed MURA 2.0 urban renewal plan

    September 26, 2026

    Medford Parks and Recreation volunteers donated 262 hours and removed more than 1,300 pounds of trash and debris in August

    September 24, 2026

    Medford crews install new pavement markings and parking layout on Main Street as work continues overnight

    September 24, 2026
    Latest news
    • Oregon State Football Depth Chart for ASU Sun Devils
    • RV park provides shelter for Asante employees displaced by fires
    • Teacher says ‘man would have killed her if she was white’ after he pulled a large butcher knife and robbed the 36-year-old woman before locking her inside a closet!
    • Grants Pass City Council Approves Two Additional Resting Sites for Unhoused Individuals
    • Grants Pass Deploys Mobile Surveillance Trailer at Homeless Camp, Sparking Concerns

    Facebook Twitter Instagram Pinterest
    • Local News
    • Oregon
    • Community
    • COVID-19
    • Crime
    • Education
    • Environment
    • Trending
    • About us
    © 2026 Medford Report. Designed by Tony Cooper.

    Type above and press Enter to search. Press Esc to cancel.